Air Blower Inspection: Step-by-Step Guide

Air blower Inspection checklist

Inspection Date –
Serial number of blower/Tag no-
Frequency of Inspection-monthly
Site Name: 
SL No Parameters Yes/No/NA Remarks
1 Is double insulated plastic body?
2 Is machine body is without cracks/body damage?
3 Is switch physical condition is good?
4 Is screw of body frame are in place?
5 Is double insulated cable available with blower?
6 Is cable joint free from three meters?
7 Is machine has normal sound during operation?
8 Is cable sleeve available near machine entry?
9 Is ON/Off switch available?
10 Is periodically machine is inspected by maintenance department?
11 Is cable is appropriate rating?
12 Is inspection label available & pasted on machine?
13 Is power supply taken from adequate extension board which is mounted with RCCB/ELCB?
Machine should be approved if all parameters available is yes category
Next Due Date of Inspection
Inspected by (Safety officer/Engineer/Site In charge)
Checked By Site In charge:

 

 

Prepared By SOLARPV1 Checked By SOLARPV1 Approved By SOLARPV1

Doc. H&S/Air blower inspection checklist/01         Rev. 00                                            Date: